From design to a fully documented handover

Design deliverables, the takt plan on site, the test plan and the O&M documentation are connected. Used on the E39 Herdal to Røyskår, Kuben in Bergen and a 1 GW data center project in the US.

Takt plan in TaskCtrl with trains moving through the areas week by week.

Used in projects by

Implenia COWI Seltor Stoltz JVIS Hæhre Skanska Statsbygg AF Gruppen Caverion Risa KCO Bybanen Skygard FTI

One method, whoever leads the project

In TaskCtrl, you build one consistent way of delivering projects. The model is copied to the next project, so each project starts where the last one left off.


We know what goes wrong in complex projects,
because we've experienced it ourselves.

Planning, construction, completion and O&M often happen in different systems, with manual handoffs between phases. That costs time, money and oversight.

Worker in a hard hat shining a flashlight on cable trays and ventilation ducts above an open ceiling

Late detection

Defects and delays are often discovered too late to avoid extra cost.

Laptop, tablet and phone showing spreadsheets on a desk in a site office, with a crane and construction site outside the window

Duplicate work

The same information gets entered multiple times, in multiple systems, by multiple people.

Open electrical cabinet with blank labels on the terminal blocks and a tablet with a dark screen

Incomplete handover

O&M documentation ends up incomplete or delayed at handover.

TaskCtrl brings the whole process together in one system, so issues surface early, duplicate work disappears, and handover is complete from day one.


Built for complex projects

TaskCtrl scales from single projects to large, multi-disciplinary programs with many stakeholders and long timelines.

Construction site at dusk with a crane and two workers in high-visibility jackets looking at a tablet

Construction

From design and engineering to takt-based production, systematic completion and O&M handover.

Road project with a bridge along the fjord and a tunnel entrance where two workers stand by an excavator

Civil Engineering

Systematic completion, commissioning and production management for road, tunnel and infrastructure projects with many interfaces and stakeholders.

TaskCtrl for infrastructure →
Worker with a hard hat and tablet in an industrial plant with pipework and steel structures

Industry

Structured test planning and document control for technically complex industrial projects.

Worker with a tablet at an open switchboard in a data hall with server racks

Data Centers

Strict requirements for systematic completion, test documentation and quality control throughout all phases.

How we solve it → TaskCtrl for data centers →

Everything you need in one system

Five core modules covering the project lifecycle, plus more that support the whole project.

See all modules in detail →

How they use TaskCtrl

Using TaskCtrl for systematic completion gave us a detailed overview of system status in the project, making it easy to stay updated on progress. On site, it is particularly useful to have access to the test protocol directly on mobile.
Cathrine Øvrebø Lund Project Management and Development, COWI
Read the customer case →
TaskCtrl gives me full control of what we're working on. It gives me predictability in the delivery. And when I reach the point where I can deliver, it's almost just a matter of pressing a button, and it's delivered.
Wendy Nylund Head of Systematic Completion, Implenia (JVIS)
Read the customer case →
Civil / E39

Implenia & JVIS: E39 Herdal to Røyskår

JVIS uses TaskCtrl for systematic completion during the construction of the new E39 motorway in Lyngdal, Agder. The systematic completion, construction and documentation modules are used in parallel throughout the execution phase.

Construction / Bergen

COWI & Stoltz: Kuben, Bergen

COWI and Stoltz used TaskCtrl to ensure efficient design management and systematic completion of the Kuben project, part of BOB's new residential portfolio in Bergen.

Data Center / USA

Faith Technologies Inc.: 1 GW data center project, USA

FTI is TaskCtrl's first signed customer in the United States. The project covers construction execution, takt scheduling, systematic completion and test documentation across all disciplines.

Construction / LEAN

Seltor: LEAN execution

Seltor uses the construction module in TaskCtrl to implement LEAN on their projects, with visual board follow-up and daily progress registration on mobile.


See TaskCtrl in action

Book a no-obligation demo and get a walkthrough tailored to your project or organization.